Industrial Commissioning & Performance Testing
Commissioning a high-capacity potato processing plant requires rigorous calibration of electrical automation, steam/thermal oil pipelines, mechanical conveyors, and sanitation protocols. At CEMNAZ Machine, our commissioning engineers remain on-site throughout the transition from test runs to full commercial output.
Phase-by-Phase Operational Sequence
- Dry Mechanical Testing: Individual motor rotations, belt alignment, and sensor feedback loops.
- Thermal & Hydraulic Calibration: Blanching water circulation, heat exchanger PID calibration, and oil filtration balance.
- Live Potato Trial Runs: Continuous slicing, blanching starch wash, par-frying moisture control, and IQF crust freezing.
- Operator & Maintenance Training: PLC HMI panel navigation, CIP sanitation cycles, and preventive maintenance routines.
Our commitment ensures your facility reaches targeted kilograms-per-hour capacity with zero initial downtime and complete food safety compliance.